Dublin Bathroom Remodelling in Easy Steps

The excitement of planning a full bathroom remodel lasts only until the practical considerations begin to weigh heavily. Fear of the unknown, more than the design, is the main source of reluctance for many residents in Swords and the surrounding Dublin area.

We eliminate the delays caused by unreliable subcontractors and provide a highly organised, stress-free installation by keeping all specialist crafts entirely in-house. What follows is a detailed account of every step of our intensive seven-day bathroom makeover.

Before the build. Setting the foundation

The success of a turnkey finish is dictated long before the first tile is lifted. We manage three critical phases before our fitters ever begin the physical work.

Step 1: The free home survey & consultation

Learning your routine and the layout of your property is the first step. After visiting your property, our founder George will evaluate the current plumbing, take precise measurements, and create a plan for your unique design. Whether it’s designing a high-end wet room or finding the best way to fit a tiny toilet under the stairs, we’ll make sure everything is square, assess the water pressure, and go over space-saving tips.

A professional bathroom fitter will:

  • Measure the bathroom
  • Check the condition of existing plumbing and electrics
  • Identify any potential issues (damp, access, structural)
  • Discuss your design preferences, layout changes, and budget
  • Confirm whether the project is a 7-day standard remodel or needs more time

Step 2: The fully itemised quotation

Following the survey, we provide 100% price transparency. You will receive a straightforward, fully itemised fixed-price quote with absolutely no hidden fees. With our complete bathroom renovations starting from €8,500, we ensure you have complete financial clarity on all labour, premium materials, plumbing supplies, and waste disposal before you commit.

A professional renovator will provide a detailed written quote covering:

  • All relevant labour (strip-out, plumbing, electrical, tiling, fitting)
  • All materials (tiles, sanitaryware, plumbing and electrical supplies) – included or not, depending on client preferences
  • Waste removal and disposal
  • Project timeline (start date, completion date) – these are estimates ONLY, as sometimes, you can’t see the intrisecs behind the walls or floors, as timelines are based on similar properties, experience and specified fittings and features.

Step 3: Personalised design & material selection

We help you choose the best brassware, sanitaryware, natural stone, and large-format porcelain. Before your start date, we will take care of all the ordering, supply, and logistics to make sure every fixture is ready and quality-checked.

Planning a bespoke bathroom, en-suite, or wet room transformation? Share your vision with our dedicated team and we’ll manage every technical detail from start to finish.

★★★★★ 5.0 Premium Craftsmanship • Dublin, Swords & Surrounding Areas
Complete Renovations Complete design & build
Wet Rooms & En-suites Flawless level-access
Premium Installations Professional plumbing & tiling

A typical 7-day bathroom remodel

Day 1: Complete strip-out & Site preparation

We take the room back to its bare structure. Our crew carefully removes the old toilet, basin, bath or shower tray, existing tiles, and any compromised plasterboard.

  • What you will see: Dust, noise, and your old fixtures being efficiently loaded into a skip. The room will be stripped to the studs and subfloor.
  • What you need to do: Simply remove all personal toiletries, towels, and laundry baskets the night before.

Day 2: Plumbing & electrical 1st-fix

Our in-house professional plumbers and electricians take over, routing new hot and cold water pipes, waste connections, and electrical cabling to match your new bespoke layout. This includes preparations for smart showers, extractor fans, heated towel rails, and underfloor heating.

  • What you will see: Exposed pipes and wiring running through bare walls. It will not look like a bathroom yet, which is entirely normal.
  • What you need to do: Nothing. Ensure our team has clear access to the main water shut-off and your fuse board.

Day 3: Advanced structural preparation & chemical tanking

This is the most critical phase for long-term durability. We level the floors and board the walls to create a perfectly flat, stable surface. For wet rooms and shower enclosures, we apply an advanced chemical tanking system, a multi-layered waterproof membrane that completely seals the structural floor and walls. This rigorous spatial planning and waterproofing guarantee a leak-proof finish.

  • What you will see: Smooth, leveled surfaces and a distinct waterproof coating applied to the wet zones.
  • What you need to do: Let the tanking cure undisturbed overnight.

Days 4 & 5: Tiling, grouting, and finishing

The room finally begins to transform into your personal sanctuary. Our seasoned tilers meticulously install your chosen wall and floor tiles, starting with complex cuts around niches and windows. On Day 5, we execute precision grouting to ensure perfectly leveled, sealed surfaces that will stand the test of time.

  • What you will see: A stunning, fully tiled room. The high-end aesthetic is immediately apparent.
  • What you need to do: Allow our tilers to work uninterrupted; achieving an exacting finish requires intense concentration.

Day 6: Sanitaryware fitting

We install your roll-top bath, low-profile shower tray, custom glasswork, toilet, and vanity units. Our plumbers connect the premium brassware to the pipework laid on Day 2, ensuring optimal water pressure and flawless operation.

  • What you will see: A nearly complete, showroom-quality bathroom.
  • What you need to do: Confirm any final, minor preferences, such as the exact height of your heated towel rail or vanity mirror, before they are permanently secured.

Day 7: Final fix, precision sealing & handover

Our team applies meticulous silicone sealing around all wet zones, makes final calibrations to shower valves, and conducts a deep, professional clean. We then invite you in for a comprehensive walkthrough.

  • What you will see: Your breathtaking, fully functional bathroom oasis, ready for immediate use.
  • What you need to do: Walk through the space with your dedicated project manager. Test the water pressure, inspect the tiling, and experience the premium quality firsthand. We do not consider the job done until you are absolutely thrilled.

Living without a bathroom. The honest reality

We understand how difficult it is to lose use of a main lavatory, but we are committed to ensuring that you experience as little disturbance as possible. Every day, we will leave your property in pristine condition and keep you informed every step of the way. The usual procedure for our Dublin clients dealing with the 7-day turnaround is as follows:

Your Living SituationThe Practical Solution
Homes with an En-suite or Guest WCTransition all daily routines to the secondary bathroom for the week.
Single-bathroom homesRely on a trusted neighbour, nearby family member, or workplace facilities for showering.
Apartments / Tight quartersMany clients choose to schedule a short getaway or stay with family during Days 1 through 5.

Note: The toilet is typically the very last item removed on Day 1, and our plumbers will always attempt to reconnect a temporary toilet at the end of the day if the structural layout permits.

Frequently asked questions

  • How much does a full bathroom remodel cost in Dublin right now?

    The average cost of a fully renovated bathroom in Dublin is between €11,000 and €14,000. Because of the complex architectural work involved, fully constructed, level-access luxury wet rooms can cost anywhere from €13,500 to more than €20,000, while compact en-suite renovations can start at €8,500.

  • Do I need planning permission?

    No. Standard bathroom and wet room renovations fall under exempted development in Ireland, provided you are not altering the external structure of the property.

  • Can I stay in my home during the renovation?

    Sure thing. At home, most of our clients are. The workplace is kept under tight control since we handle all trades in-house. The lack of shower facilities for an entire week and the noise that comes with the first day’s strip-out are the two biggest problems.

  • What happens if you find water damage behind my old tiles?

    For this reason, we think a 10% contingency budget is a good idea. We have the in-house knowledge to fix any concealed subfloor rot or obsolete, dangerous wiring that our fitters may find. We will do it quickly, safely, and transparently so that your timeline is not derailed.

We will take care of all the technical details after you contact to schedule your free home survey so you can start exploring the possibilities of your space.

share:
Bath Craft Advice

Related articles

Explore the most recent design inspiration and technical insights from Dublin's leading bathroom renovation experts. Operating from Swords across the greater Dublin area, our expert team shares professional advice and architectural trends to help you plan your elegant bathroom transformation.